The short answer

Landed cost is what it costs to get a product to your door: the supplier's price plus freight, insurance, duties, customs fees, broker charges and delivery to your site. To compare a US quote with an import quote fairly, put both on the same basis first. Then add what a factory price leaves out: the cash tied up in extra inventory, the cost of rework and rejected parts, and the cost of a late shipment. Divide the total by the number of good parts you actually receive.

Below is each line, where to look up duties and customs fees from official sources, and a worked example with round numbers. The example is hypothetical. It isn't a price, a duty rate or a prediction for your product. For a real shipment, confirm classification and fees with a licensed customs broker or with CBP.

Put both quotes on the same basis

Check what each quote includes before you add anything. A US quote may include delivery to your dock. An import quote may stop at the factory gate or the port of export. Note the quantity, currency, payment terms, packaging and delivery term on each one.

Ask both suppliers the same things: what the unit price includes, the minimum order quantity, how tooling or setup is charged, the payment schedule, and where responsibility for the goods passes to you. If one quote covers delivery and the other doesn't, add the missing freight to the second quote. Don't subtract it from the first. Then convert both to cost per good part delivered to your site. Our guide to writing a manufacturing RFQ shows how to ask for quotes in a format that makes this easier. If you only have the import quote so far, get a domestic one to put next to it. FirmsLedger lists US manufacturers for sheet metal fabrication, CNC machining and injection molding, among other processes.

Practical takeaway: Make one spreadsheet row per cost line and fill it in for both quotes, even when the value is zero.

Add freight and insurance for every leg

An import usually has several legs: factory to port, the international move, and port to your site. Get written quotes from a freight forwarder for each leg, plus cargo insurance. A domestic order may be one truck.

Ask the forwarder what's included and what's billed separately, for example origin handling, destination terminal charges, delivery from the port and storage if the cargo isn't picked up on time. Duty is a separate question. US customs value is generally based on the transaction value of the goods, and 19 U.S.C. 1401a(b)(4)(A) excludes transportation, insurance and related services for the international shipment from the price actually paid or payable. So the ocean freight usually isn't in the duty base. But you still pay it, and it stays in your landed cost. Your broker can confirm the customs value for your entries.

Practical takeaway: Use forwarder quotes for your actual lane and shipment size, not a rate card for someone else's lane.

Look up the duty rate in the HTSUS

Duty rates come from the Harmonized Tariff Schedule of the United States, published by the US International Trade Commission at hts.usitc.gov. Find the classification for your product, then read the general rate and any special program rate.

Look at Chapter 99 of the HTSUS too. Its headings carry additional duties that sit on top of the base rate, written in the HTS as the duty in the applicable subheading plus a percentage. CBP's page on determining duty rates says CBP makes the final determination of the correct rate, not the importer, and that you can request a binding ruling for a specific item. Rates change. A rate copied from last year's quote or a forum post isn't a safe input. If you're unsure of the classification, ask a licensed customs broker or get a ruling before you commit to volume.

Practical takeaway: Write down the HTS number, the rate and the date you checked it. Recheck before every order.

Add customs fees and broker charges

On November 16, 2026, CBP's user fee table listed the Merchandise Processing Fee for formal entries at 0.3464% ad valorem, with a $34.58 minimum and a $670.86 maximum. It listed the Harbor Maintenance Fee for imports at 0.125% ad valorem.

CBP's page says the rates are subject to adjustment, and it was last modified October 9, 2026, so check it again when you build your model. CBP also publishes guidance on MPF and preferential trade programs, because goods that qualify under certain trade agreements can be exempt. Ask your broker whether the Harbor Maintenance Fee applies to your mode and port of entry. Then add the broker's own charges, like entry preparation and any bond. Licensed customs brokers conduct customs business for others, as CBP explains. Their fees come from their own quotes, not from CBP.

Practical takeaway: Get your broker's fee schedule in writing and give it its own line.

Price the inventory you'll carry

Longer transit and bigger minimum orders usually mean you hold more stock and pay for it sooner. That cash has a cost. Ask your finance team for the annual carrying rate your company uses for inventory.

Lay the two plans side by side. How many weeks of supply does each order cover? When do you pay the supplier compared with when you receive and use the parts? How much safety stock do you keep because of transit time? Each answer changes the average value of inventory on your books. Carrying cost can include the cost of capital, storage, handling, insurance and the risk that a design change makes stock obsolete. Use your company's own rate, not one from an article. It depends on your cost of money and your warehouse.

Practical takeaway: Extra average inventory value × your carrying rate × the time you hold it.

Include quality, rework and returns

Price the parts you can't use: inspection, sorting, rework, replacements, and the freight to send bad parts back or rush replacements in. Base the allowance on your own receiving data if you have it.

Ask each supplier how they inspect before shipping, what records come with each lot, and what happens to a rejected lot. A replacement that has to cross an ocean takes longer and may need air freight. Count your own incoming inspection too, if you'd check one supplier harder than the other. With no history on either supplier, use the same assumption for both or run the model at a few different rates. Our guide to verifying manufacturer certifications covers checking a supplier's quality claims.

Practical takeaway: Agree in writing who pays for nonconforming parts, and at what step, before the first order.

Put a number on lead-time risk

A late shipment can mean expedited freight, overtime, an idle line or a missed customer delivery. Those costs are real even when they're uncertain. Estimate them for each supplier instead of leaving them at zero.

One simple way: estimate the cost of one late order and multiply it by the share of orders you expect to be late, from your own records or a cautious guess. Another is to price the extra safety stock you'd hold against delay. That already shows up in the carrying-cost line, so don't count it twice. A domestic supplier's shorter transit and the chance to visit the plant can lower this cost. But it depends on that supplier's capacity and track record. Ask both suppliers for their on-time delivery record and check what you can.

Practical takeaway: Ask what a four-week delay on this order would cost you, then judge how likely it is.

Work through a hypothetical example

Every figure here is invented, for arithmetic only. Order: 5,000 parts. US quote: $10.00 per part, so $50,000, plus $1,000 domestic freight. Import quote: $7.00 per part at the port of export, so $35,000, plus $3,000 international freight and insurance.

Import side. A placeholder 10% duty (not a real rate for any product) on the $35,000 value is $3,500. MPF at 0.3464% is $121.24, which falls between CBP's minimum and maximum. HMF at 0.125% is $43.75. Add an assumed $250 broker fee and $600 delivery from the port: $42,514.99, about $8.50 per part. Carrying: the import plan holds an assumed extra $21,000 of average inventory for six months at an assumed 20% annual rate, so 21,000 × 0.20 × 0.5 = $2,100. Rework: assume 3% of import parts and 1% of US parts need $5 of rework each, so $750 and $250. Totals: import $45,364.99, about $9.07 per part. US $51,250, or $10.25 per part. Now change one input. At a placeholder 25% duty, import duty is $8,750 and the import total is $50,614.99, about $10.12 per part. That's within 13 cents of the US quote. One line moved the answer.

Practical takeaway: Swap every invented input for your own quotes, your HTS rate and your company's carrying rate.

Frequently asked questions

What is landed cost?

It's the total cost of getting a product to your site: the supplier's price plus freight, insurance, duties, customs fees, broker charges and delivery. When comparing suppliers, it's worth adding inventory carrying cost and a quality allowance too.

How do you calculate landed cost per unit?

Add the product cost, every freight and insurance leg, duties, customs fees, broker charges, inland delivery, carrying cost and a quality allowance for the order. Divide by the number of good parts you expect to receive. The example above shows the arithmetic.

Is US import duty charged on freight costs?

Usually not on the international leg. US customs value is generally based on transaction value, and 19 U.S.C. 1401a(b)(4)(A) excludes international transportation, insurance and related services from the price actually paid or payable. Valuation has other rules, so confirm with your customs broker.

What is the Merchandise Processing Fee?

It's a CBP user fee on imports. On November 16, 2026, CBP's user fee table listed it for formal entries at 0.3464% ad valorem, with a $34.58 minimum and a $670.86 maximum. CBP says rates are subject to adjustment, and goods qualifying under some trade programs can be exempt.

What is the Harbor Maintenance Fee?

CBP's user fee table lists it for imports at 0.125% ad valorem of the merchandise value, paid as part of the customs entry. Ask your broker whether it applies to your mode and port of entry.

Where do I find the duty rate for my product?

In the Harmonized Tariff Schedule at hts.usitc.gov. Check Chapter 99 for additional duties as well. CBP makes the final call on the rate and offers binding rulings, so confirm the classification with a broker or a ruling before you order at volume.

Is landed cost the same as total cost of ownership?

Not quite. Landed cost usually stops at your door. Total cost of ownership goes further, into quality, inventory, risk, support and end of life. For a US vs import comparison, include at least the carrying, quality and lead-time lines covered here.

Should I include tariffs that might change?

Model today's rate from the HTSUS, then run a second case at a different rate. If a small change in duty flips the answer, your decision depends on trade policy as much as on the suppliers. That's worth knowing before you commit.

Sources

The pages this guide cites, in the order they appear.

  1. CBP · cbp.gov
  2. 19 U.S.C. 1401a(b)(4)(A) · law.cornell.edu
  3. hts.usitc.gov · hts.usitc.gov
  4. customs broker · cbp.gov
  5. CBP's user fee table · cbp.gov
  6. MPF and preferential trade programs · cbp.gov

Get 3 free quotes from metal fabrication & machining companies

Free, no account. One form, quotes from 3 matched US manufacturers. Bulk and wholesale orders welcome.